|
VAIOSoft Recovery Manager V1

Free - VAIOSoft, Inc
Recovery Manager can backup, duplicate, recover files, & format cards from many types of flash media that have been lost due to system or battery failure, format or deletion or corruption caused by hardware or software malfunction. Recovery Manager software can recover data from Digital film cards such as CompactFlash, SmartMedia, Memory Stick, MultiMediaCard (MMC), Secure Digital card (SD), IBM Microdrive, ATA PC card, ZIP, & Jazz d
recovery image, demo data recovery software, wordperfect recovery, lost image, ftp password recovery, restore mssql, corrupted wordperfect, linux disk recovery, repair word perfect, recovery wpd
|
|
|
|
Recovery for SQL Server

$499.00 - Recoveronix Ltd.
Recovery for SQL Server recovers damaged Microsoft SQL Server database files (.MDF/.NDF). It creates Transact-SQL script that re-creates the database from the scratch. Recovery for SQL Server is able to recover corrupted tables, views, stored procedures, triggers etc. Both standard and user-defined data types recovery is supported. Also repairs damaged primary keys, unique key, indexes, foreign keys. Supports MS SQL Server 6.5, 7.0, 2000, 2005.
photorecovery, corel wordperfect recovery, data recovery mac, bkf corrupted, cdr recovery, damaged excel recovery, recovery bkf, max data recovery, recover bkf, corrupted bkf
|
|
WordPerfectRecovery

$149.00 - Recoveronix Ltd.
WordPerfectRecovery is data recovery program for Corel WordPerfect documents (.wpd). WordPerfectRecovery recovers damaged files, saving recovered data to a new Corel WordPerfect-compatible RTF document. Restored are texts, tables, graphics. Current version of the product supports Corel WordPerfect 12.
corrupt bkf recover, excel repair, missing, recover disc, ms backup repair, repair bkf, mac recovery software, microsoft excel recovery, repair excel file, bkf recovery
|
|
|
|
Nucleus Kernel Data Recovery Software

$79.00 - Nucleus Data Recovery
Nucleus Kernel FAT and NTFS is the most powerful data recovery software and file undelete tool available in the market, and can easily recover your accidentally deleted files. Kernel data recovery software can easily recover data from formatted or corrupted partitions and hard drives. It is a robust data recovery software, powered with corrupt zip repair. An easy to use data recovery utility for Windows 98/Me/NT/2000/XP/2003.
recover data from cd, bkf repair, cd data rescue, erased, recover microsoft, recover deleted, bkf fix, fix excel file, veritas backup recovery, recover data from dvd
|
|
Smart Flash Recovery

Free - Smart PC Solutions, Inc.
Smart Flash Recovery is a data recovery tool for Windows operating system that supports the FAT 16/32 file system. The software easily recovers data from any type of storage media - flash drives, USB drives, digital cameras, memory stick, PC card, multimedia card, secure digital card.
indisc recovery, fat32, ms excel file recovery, undo delete, cd recover, recover lost, backup repair, corrupt excel repair, excel recovery, bkf doctor
|
|
3.0 Restorer2000 Data Recovery

$29.99 - Bitmart Inc.
Restorer2000 3.0 is the reliable data recovery utility that provides you with powerful undelete, data recovery and disk restoration functionality. With Restorer2000 3.0 data recovery software you can view and restore deleted files and folders. Disk Scan option gives you outstanding unformat ability to recover data from formatted, reformatted, corrupted and damaged NTFS and FAT hard drives and partitions.
excel file recovery, corrupt excel recovery, recover udf, cdrw recovery, bkfrecovery, dvd data recovery, xls undelete, softlogica, unprotect vba, recover vba password
|
Show: All | Freeware
|